Close
Kingwood Spaces

HCFCD to Unveil Final Design of Woodridge/Taylor Gully Project on July 1 - Reduce Flooding {"@context":"https://schema.org","@graph":[{"@type":"Article","@id":"https://reduceflooding.com/2025/06/20/hcfcd-to-unveil

HCFCD to Unveil Final Design of Woodridge/Taylor Gully Project on July 1 - Reduce Flooding {"@context":"https://schema.org","@graph":[{"@type":"Article","@id":"https://reduceflooding.com/2025/06/20/hcfcd-to-unveil
Go to top of page
Source: Reduce Flooding Blog - Bob Rehak
Date: 06/20/2025 7:44pm

Article Summary:
"Harris County Flood Control District Unveils Final Design for Woodridge/Taylor Gully Flood Mitigation Project – Virtual Meeting Scheduled for July 1, 2025"
The Harris County Flood Control District (HCFCD) will present the final design for the Woodridge/Taylor Gully Project on July 1, 2025, in a virtual public meeting. This project, which aims to mitigate flooding issues in Kingwood, includes plans for significant stormwater detention and infrastructure improvements, and is supported by a $42 million grant application to the U.S. Department of Housing and Urban Development. The project is expected to go out for construction bids in October, and public input is encouraged during the meeting.

Read article here »