Northpark Traffic Switch Starts Tonight at 9 - Reduce Flooding {"@context":"https://schema.org","@graph":[{"@type":"Article","@id":"https://reduceflooding.com/2025/06/06/northpark-traffic-switch-starts-tonight-at-
Northpark Traffic Switch Starts Tonight at 9 - Reduce Flooding
{"@context":"https://schema.org","@graph":[{"@type":"Article","@id":"https://reduceflooding.com/2025/06/06/northpark-traffic-switch-starts-tonight-at-
Source: Reduce Flooding Blog - Bob Rehak
Date: 06/06/2025 4:57pm
Article Summary:
"Northpark Traffic Detour Begins Tonight for Major Drainage and Paving Project"
Starting tonight at 9 PM, a significant traffic switch will occur on Northpark's westbound lanes between Loop 494 and US59, redirecting traffic to newly completed concrete lanes to facilitate drainage improvements and repaving of the center lanes. Additionally, construction crews have initiated the boring process under railroad tracks to enhance stormwater drainage, with further updates pending on the engineering review of the Enclave Detention basin.
Read article here »
Date: 06/06/2025 4:57pm
"Northpark Traffic Detour Begins Tonight for Major Drainage and Paving Project"
Starting tonight at 9 PM, a significant traffic switch will occur on Northpark's westbound lanes between Loop 494 and US59, redirecting traffic to newly completed concrete lanes to facilitate drainage improvements and repaving of the center lanes. Additionally, construction crews have initiated the boring process under railroad tracks to enhance stormwater drainage, with further updates pending on the engineering review of the Enclave Detention basin.
Read article here »

