Contractor Only Partially Complies with BMPs at Foster Elementary Reconstruction Site
Contractor Only Partially Complies with BMPs at Foster Elementary Reconstruction Site
Source: Reduce Flooding Blog - Bob Rehak
Date: 01/06/2025 8:38pm
Article Summary:
"Concerns Raised Over Incomplete Compliance with Sediment Control Practices at Foster Elementary Reconstruction Site"
Concerns have been raised regarding the implementation of best management practices (BMPs) at the Foster Elementary reconstruction site in Kingwood, where sediment-laden runoff has been reported escaping the site and entering storm drains. While some measures, like straw wattles for sediment control, have been installed, critical protections such as silt fences and storm drain inlet safeguards remain inadequate. Local residents and advocates are urging the Humble ISD school board to ensure compliance with environmental standards to mitigate flood risks.
Read article here »
Date: 01/06/2025 8:38pm
"Concerns Raised Over Incomplete Compliance with Sediment Control Practices at Foster Elementary Reconstruction Site"
Concerns have been raised regarding the implementation of best management practices (BMPs) at the Foster Elementary reconstruction site in Kingwood, where sediment-laden runoff has been reported escaping the site and entering storm drains. While some measures, like straw wattles for sediment control, have been installed, critical protections such as silt fences and storm drain inlet safeguards remain inadequate. Local residents and advocates are urging the Humble ISD school board to ensure compliance with environmental standards to mitigate flood risks.
Read article here »

