To accommodate the closure of the bridge, crews will reroute the southbound mainlanes onto the northbound mainlanes of I-69 Eastex Freeway prior to the bridge. This will allow motorists to bypass the southbound bridge closure. Southbound motorists will then return to the southbound mainlanes near the Townsen overpass.
Three northbound mainlanes and three southbound mainlanes will share the northbound bridge across the river while the southbound and the northbound frontage roads will remain as three lanes each across the river. The southbound entrance ramp from Kingwood Dr. and northbound entrance ramp from FM 1960/Townsen will be closed. The HOV entrance and exit to Kingwood Dr. will be also closed and will be rerouted to the Townsen Park and Ride entrance and exit during this time.
To prepare the roadway for the reconfigured lanes, crews will need to close multiple mainlanes and ramps over the course of the next two weeks to facilitate the bridge construction to begin March 23.
· I-69 Eastex northbound mainlanes between FM 1960 to Sorters McClellan Rd., two right lanes closed continuously beginning Saturday, March 10 at 3 a.m. through Monday, March 12 at 5 a.m.
· I-69 Eastex northbound entrance ramp from FM 1960/Townsen total closure beginning Saturday, March 10 at 3 a.m. through Sunday, March 11 at 7 a.m. Additionally, this ramp will be closed through the duration of the project, effective 9 p.m., Tuesday, March 13. Detour northbound on the frontage road to the entrance ramp from Sorters McClellan Rd.
· I-69 Eastex northbound mainlanes between FM 1960 to Sorters McClellan Rd., two right lanes closed nightly from 9 p.m. to 5 a.m. Tuesday, March 13 through Thursday, March 15.
· I-69 Eastex northbound exit ramp to Kingwood Drive total closure nightly from 9 p.m. to 5 a.m., Wednesday, March 14 and Thursday, March 15. Additionally, this ramp will be closed continuously Friday, March 16 at 9 pm through Monday, March 19 at 5 a.m. Detour via the northbound mainlanes to the exit ramp to Northpark Dr.; U-Turn at Northpark Dr. and then follow the southbound frontage road to either Kingwood Dr. or Sorters McClellan Rd.
· I-69 Eastex northbound mainlanes between FM 1960 to Sorters McClellan Rd., four alternate lanes closed continuously beginning Friday, March 16 at 9 p.m. through Monday, March 19 at 5 a.m. At least one mainlane will remain open.
· I-69 Eastex northbound exit ramp to Loop 494/ McClellan/ Hamblen total closure continuously Friday, March 16 at 9 pm through Monday, March 19 at 5 a.m. Detour via the northbound mainlanes to the exit ramp to Northpark Dr. and then follow the frontage road to the U-Turn at Northpark Dr. to the southbound frontage road to either Kingwood Dr. or Sorters McClellan Rd.
The project is being expedited and is expected to be completed in about six months. The goal is to complete the work while making every effort to minimize the impacts on the traveling public. 4951
Replies:
Moving my RV to Wally World in Humble, rotate to Sam's every other day. Maybe rent an apartment downtown for 6 months, it's going to be a mess 4 lanes down to 3 lanes, road rage. 4951
Ok, I know this is going to be awful but it won't last forever. At least we know there will be an end to the lane closures. I'm so glad the access roads will remain open. I want a map showing how it's going to be. I mean really now, shouldn't there be a drawing? 4951
6 months?? Let the heavy loaders use the frontage roads. I drive back and forth 3 or 4 times daily over that bridge. This will suck!! 4951
remembering the good old days when you'd stop at the stop sign on kingwood drive @ 59 for 2-lane northbound traffic. race across to the dusty median when there was an opening. and then pedal to the metal to hop on southbound into town. who needs under/over passes. 4951

I really doubt it will be much worse than when they redid the overpass at Kingwood Dr. That took a while, but it wasn't nearly as bad as we thought it would be. Everyone just needs to be positive about it, know it's necessary and add a little time to their commute for a while.
Remember folks...it's temporary and it could have been so much worse. Let's try to be grateful it's not. 4951
Remember folks...it's temporary and it could have been so much worse. Let's try to be grateful it's not. 4951
Ok, I know this is going to be awful but it won't last forever. At least we know there will be an end to the lane closures. I'm so glad the access roads will remain open. I want a map showing how it's going to be. I mean really now, shouldn't there be a drawing?
This discussion has been locked.